| SNo. |
Department |
Tender Title |
Reference Number |
Tender Date |
Closing Date |
Bid Opening Date Technical |
Bid Opening Date Financial |
Finalised |
Date of Finalization |
| 1 |
Directorate of Industries/Directorate of Industries |
PHORATE
2009_UPDOI_315_1 |
82(G)/SPS-7-ET/RC-2009-10 |
07/10/2009 |
04/11/2009 |
04/11/2009 |
- |
No |
- |
| 2 |
Directorate of Industries/Directorate of Industries |
PRE-CAST CONCRETE PIPE SPIGOT AND SOCKET
2009_UPDOI_314_1 |
81(G)/SPS-7-ET/RC-2009-10 |
07/10/2009 |
09/11/2009 |
09/11/2009 |
- |
No |
- |
| 3.1 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
PC AND SEAL COAT WORK BY FOUR MIXOL BATTERY for Repair of Kaima Kaimerakhurd Devkaliya link roads of Ambedker Village Selection year 1995-96
2009_CEUCZ_309_2 |
5673/ 293C/STP-KHI/Tender/09-10 |
07/10/2009 |
21/10/2009 |
22/10/2009 |
- |
No |
- |
| 3.2 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
PC AND SEAL COAT WORK BY FOUR MIXOL BATTERY for Repair of Semrimediya Mohmadpur Majhiya link roads of Ambedker Village Selection year 1995 96
2009_CEUCZ_309_3 |
5673/ 293C/STP-KHI/Tender/09-10 |
07/10/2009 |
21/10/2009 |
22/10/2009 |
- |
No |
- |
| 4 |
Directorate of Industries/Directorate of Industries |
BRUSHES
2009_UPDOI_312_1 |
78(C)/SPS-7-ET/RC-2009-10 |
06/10/2009 |
06/11/2009 |
06/11/2009 |
- |
No |
- |
| 5 |
Directorate of Industries/Directorate of Industries |
TATPATTI
2009_UPDOI_313_1 |
79(C)/SPS-7-ET/RC-2009-10 |
06/10/2009 |
06/11/2009 |
06/11/2009 |
- |
No |
- |
| 6 |
Directorate of Industries/Directorate of Industries |
KHAKE ROUND NECK WORESTED JERSEYS(VC)
2009_UPDOI_311_1 |
77(C)/SPS-7-ET/QC-2009-10 |
06/10/2009 |
28/10/2009 |
28/10/2009 |
- |
No |
- |
| 7 |
Directorate of Industries/Directorate of Industries |
WIRE ROPE
2009_UPDOI_310_1 |
80(J)/SPS-7-ET/RC-2009-10 |
06/10/2009 |
06/11/2009 |
06/11/2009 |
- |
No |
- |
| 8 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Construction of NINE Habitation of Mundera Amebedker Villege of Selection year 1995 96
2009_CEUCZ_309_1 |
5673/ 293C/STP-KHI/Tender/09-10 |
06/10/2009 |
21/10/2009 |
22/10/2009 |
- |
No |
- |
| 9 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur/Construction Division, Sitapur |
Renewal of village Roads by 20mm PC and Seal coat with Hot Mix Plant in Block Gondlamau Khairabad Misrikh in Year 2009 10 Under Dr Ambedkar Gram Vikash Yojna 95 96 As per boq
2009_CEUCZ_308_1 |
5593 /tender/STP-Kheri/09-10 DT. 01-10-09 |
05/10/2009 |
14/10/2009 |
15/10/2009 |
- |
No |
- |
| 10 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur/Construction Division, Sitapur |
Re Construction of Ramgarh Sugar Mill Link road Under Dr Ambedkar Gram Vikash Yojna 95 96 in year 2009 10
2009_CEUCZ_307_1 |
5594 /tender/STP-Kheri/09-10 DT. 01-10-09 |
05/10/2009 |
14/10/2009 |
15/10/2009 |
- |
No |
- |
| 11 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Kanpur |
Sikandra Jhinjhak Rasulabad Km 21 - 24
2009_CEUKZ_306_1 |
5062 M/39M-KV/09 |
03/10/2009 |
14/10/2009 |
15/10/2009 |
- |
No |
- |
| 12 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Kanpur |
Widening and Strenghtening of Sikandra Bhognipur Road
2009_CEUKZ_305_1 |
5059 M/39M-KV/09 |
03/10/2009 |
14/10/2009 |
15/10/2009 |
- |
No |
- |
| 12.1 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Kanpur |
Widening and Strenghtening of Sikandra Bhognipur Road
2009_CEUKZ_305_2 |
5059 M/39M-KV/09 |
03/10/2009 |
14/10/2009 |
15/10/2009 |
- |
No |
- |
| 13 |
U P Irrigation Department (Mechanical)/Central Equipment and Stores Procurement |
For issue of Rate Contract for manufacture and Supply of ISI marked PVC Insulated Copper Winding Wires
2009_UPIDM_303_1 |
TE-654/2009-10 |
03/10/2009 |
04/11/2009 |
04/11/2009 |
- |
No |
- |
| 14 |
UP Electronics Corporation Ltd./UPLC HQ |
Empanelment of Registered Companies in the Field of IT
2009_UPECL_302_1 |
UPLC/Software/Empanelment-01/2009 |
02/10/2009 |
03/11/2009 |
04/11/2009 |
- |
No |
- |
| 15 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/Construction Division-1, Lucknow |
Construction of Retaining wall alongwith Sharda Canal in RHS at VIP Road
2009_CEUCZ_300_1 |
10163/523C/LKO CIRCLE /2009-10DATE 24.09.09 |
29/09/2009 |
08/10/2009 |
09/10/2009 |
- |
No |
- |
| 16 |
Directorate of Industries/Directorate of Industries |
TRICHODERMA
2009_UPDOI_301_1 |
76(G)/SPS-7-ET/RC-2009-10 |
29/09/2009 |
21/10/2009 |
21/10/2009 |
- |
No |
- |
| 17 |
Directorate of Industries/Directorate of Industries |
PILLOR POST
2009_UPDOI_298_1 |
75(G)/SPS-7-ET/RC-2009-10 |
25/09/2009 |
21/10/2009 |
21/10/2009 |
- |
No |
- |
| 18 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
Construction of RCC Minor Bridge in Km 17 of Bani Mohanlalganj Gosaiganj road]
2009_CEUCZ_297_1 |
10059 /523C-LKO.CIR/Tender/09-10 dt.16-09-09 |
23/09/2009 |
26/09/2009 |
29/09/2009 |
- |
No |
- |
| 19 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
Construction of 3x12 m span Bridge of Lucknow Kursi Mahmudabad Road in Km 12
2009_CEUCZ_296_1 |
10060/523C-LKO.CIR /Tender/09-10 DT.06-09-09 |
20/09/2009 |
24/09/2009 |
24/09/2009 |
- |
No |
- |
| 20 |
UPTRON Powertronics Limited/UPTRON Powertronics Ltd, HQ |
EMPANELMENT OF OEM SINGLE AUTHORISED DEALERS
2009_UPPOW_293_1 |
EMP-UPL/01/2009-10 |
17/09/2009 |
30/09/2009 |
30/09/2009 |
- |
No |
- |
| 21 |
UP New and Renewable Energy Development Agency/UP New and Renewable Energy Development Agency,HO |
Solar Water Heating Systems
2009_UPNED_291_1 |
UPNEDA/SWH/09 |
16/09/2009 |
08/10/2009 |
08/10/2009 |
- |
No |
- |
| 22 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Etawah |
Widening and Strengthening of BP road km 266 to 279
2009_CEUKZ_292_1 |
5687/55-C/ETAWAH CIRCLE/09 |
16/09/2009 |
06/10/2009 |
07/10/2009 |
- |
No |
- |
| 23 |
Directorate of Industries/Directorate of Industries |
ISOPROTURON
2009_UPDOI_290_1 |
74(G)/SPS-7-ET/RC-2009-10 |
16/09/2009 |
30/09/2009 |
30/09/2009 |
- |
No |
- |
| 24 |
UP Development Systems Corporation Ltd/UPDESCO HQ/UPDESCO HQ |
Updesco Hardware Empanelment 2009
2009_UDSCL_289_1 |
UPDESCO/HW-EMP/2009/01 |
14/09/2009 |
07/10/2009 |
07/10/2009 |
- |
No |
- |
| 25 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Etawah/Construction Division-2, Auraiya |
Strengthening of NH91A Near Taj pur to BP Road SH 21 Purwa Dansha Sahar
2009_CEUKZ_288_1 |
5549/55-C/ETAWAH CIRCLE/09 |
14/09/2009 |
24/09/2009 |
25/09/2009 |
- |
No |
- |
| 26 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Etawah/Construction Division-2, Auraiya |
Widening and Strengthning of Chhibramau Saurikh Bidhuna Road km 28 to 31
2009_CEUKZ_279_1 |
5460/55C/Etawah Circle/09-10 dt-08-09-2009 |
10/09/2009 |
24/09/2009 |
25/09/2009 |
- |
No |
- |
| 27 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
Widening and Strengthening of Jail Road to VIP Road Behind of Manyawar Kashiram Smarak
2009_CEUCZ_284_1 |
9833 /523C-Lko Cir /Tender/09-10 DT.09-09-09 |
10/09/2009 |
15/09/2009 |
16/09/2009 |
- |
No |
- |
| 28 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
[Widening and Strengthening of Rd (2 lane to 4 lane) Near Gandhi Setu Chauraha between Haider Canal Setu to Gomti Barrage ]
2009_CEUCZ_283_1 |
9834/523C-Lko Cir /Tender/09-10 DT.09-09-09 |
10/09/2009 |
15/09/2009 |
16/09/2009 |
- |
No |
- |
| 29 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Farrukhabad/Construction Division, Kannauj |
Widening and Strengthning of Chhibramau Saurikh Bidhuna Road 11 to 27 KMs
2009_CEUKZ_278_1 |
4106M 39M FKV 09 |
09/09/2009 |
24/09/2009 |
25/09/2009 |
- |
No |
- |
| 30 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Re Construction of Ramgarh Sugar Mill Link road Under Dr Ambedkar Gram Vikash Yojna 95 96 in year 2009 10]
2009_CEUCZ_274_1 |
4777/tender/STP-Kheri/09-10DT.22-8-09 |
09/09/2009 |
23/09/2009 |
24/09/2009 |
- |
No |
- |
| 31 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Re Construction of RAMKOAT TO KUTUBNAGAR Link road Under Dr Ambedkar Gram Vikash Yojna 95 96 in year 2009 10]
2009_CEUCZ_276_1 |
4777(1)/tender/STP-Kheri/09-10 D.22-8-09 |
09/09/2009 |
23/09/2009 |
24/09/2009 |
- |
No |
- |
| 32 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Renewal of village Roads by 20mm PC and Seal coat with Hot Mix Plant in Block Gondlamau Khairabad Misrikh in Year 2009 10 Under Dr Ambedkar Gram Vikash Yojna 95 96 As per BOQ
2009_CEUCZ_273_1 |
4778/tender/STP-Kheri/09-10 D.22-8-9 |
09/09/2009 |
23/09/2009 |
24/09/2009 |
- |
No |
- |
| 33 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Construction of Painted raod at left Canal Patri of branch kheri in sitapur
2009_CEUCZ_272_1 |
5110/ etender /stp-kheri/ 09-10 DT.4-9-09 |
08/09/2009 |
24/09/2009 |
25/09/2009 |
- |
No |
- |
| 34 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
Widening Strengthening of Lucknow Mohan road Construction of Two nos sub ways and one no box culvert in km 17 18
2009_CEUCZ_271_1 |
9814 /523C-LO /etender/09-10 DT.7-9-09 |
08/09/2009 |
15/09/2009 |
16/09/2009 |
- |
No |
- |
| 35 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Kanpur/Construction Division-2, Kanpur |
Widening and Strengthening of Chaubepur Bela Road Km 8 to 14
2009_CEUKZ_267_1 |
13661M/39M-KV/09 |
07/09/2009 |
15/09/2009 |
16/09/2009 |
- |
No |
- |
| 36 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Farrukhabad/Provincial Division, Kannauj |
Widening and Strengthning of Chhibramau Saurikh Bidhuna Road MDR 13 Km 1 to 10
2009_CEUKZ_270_1 |
4093M/1M-FKV/09 dated 05.09.2009 |
07/09/2009 |
24/09/2009 |
25/09/2009 |
- |
No |
- |
| 37 |
UP Development Systems Corporation Ltd/UPDESCO HQ/UPDESCO HQ |
REQUEST FOR PROPOSAL FOR BID AND SELECTION OF SERVICE CENTRE AGENCY TO SET UP OPERATE AND MANAGE 1688 CSCs in Agra Zone
2009_UDSCL_269_1 |
CeG/P/10/420/2009 |
06/09/2009 |
12/10/2009 |
12/10/2009 |
- |
No |
- |
| 38 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Construction of Aliganj branch canal road from chainage 0.000 to 28.000
2009_CEUCZ_264_1 |
4924/352C/e-tender/2009-10 dt 28-08-09 |
31/08/2009 |
11/09/2009 |
14/09/2009 |
- |
No |
- |
| 39 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Etawah |
Widening and Strengthening of B.P. road km 266 to 279
2009_CEUKZ_262_2 |
5095/55C /Etawah Circle/09 |
29/08/2009 |
15/09/2009 |
16/09/2009 |
- |
No |
- |
| 40 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Etawah |
Widening and Strengthning of B.P. road km 280 to 290
2009_CEUKZ_261_1 |
5054/55C/Etawah Circle/09 |
28/08/2009 |
15/09/2009 |
16/09/2009 |
- |
No |
- |
| 41.8 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Construction of five Habitation of Sadrawa Amebedker Villege of Selection year 1995 96
2009_CEUCZ_259_8 |
1819/ 293C/STP-KHI/Tender/09-10 DT. 17-8-09 |
26/08/2009 |
14/09/2009 |
15/09/2009 |
- |
No |
- |
| 41.7 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Construction of five Habitation of Rampur Gherwa Amebedker Villege of Selection year 1995 96
2009_CEUCZ_259_7 |
1819/ 293C/STP-KHI/Tender/09-10 DT. 17-8-09 |
26/08/2009 |
14/09/2009 |
15/09/2009 |
- |
No |
- |
| 41.6 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Construction of five Habitation of Mundera Amebedker Villege of Selection year 1995 96
2009_CEUCZ_259_6 |
1819/ 293C/STP-KHI/Tender/09-10 DT. 17-8-09 |
26/08/2009 |
14/09/2009 |
15/09/2009 |
- |
No |
- |
| 41.5 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Cont of five Habitation of Kaimhrakhurdh Amebedker Villege of Selection year 1995 96
2009_CEUCZ_259_5 |
1819/ 293C/STP-KHI/Tender/09-10 DT. 17-8-09 |
26/08/2009 |
14/09/2009 |
15/09/2009 |
- |
No |
- |
| 41.4 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Const of five Habitation of Kaima Amebedker Villege of Selection year 1995 96
2009_CEUCZ_259_4 |
1819/ 293C/STP-KHI/Tender/09-10 DT. 17-8-09 |
26/08/2009 |
14/09/2009 |
15/09/2009 |
- |
No |
- |
| 41.3 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Const of five Habitation of Hariya Amebedker Villege of Selection year 1995 96
2009_CEUCZ_259_3 |
1819/ 293C/STP-KHI/Tender/09-10 DT. 17-8-09 |
26/08/2009 |
14/09/2009 |
15/09/2009 |
- |
No |
- |
| 41.2 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Const of five Habitation of Gulariya Amebedker Villege of Selection year 1995 96
2009_CEUCZ_259_2 |
1819/ 293C/STP-KHI/Tender/09-10 DT. 17-8-09 |
26/08/2009 |
14/09/2009 |
15/09/2009 |
- |
No |
- |
| 41.1 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Const of five Habitation of Devkaliya Amebedker Villege of Selection year 1995 96
2009_CEUCZ_259_1 |
1819/ 293C/STP-KHI/Tender/09-10 DT. 17-8-09 |
26/08/2009 |
14/09/2009 |
15/09/2009 |
- |
No |
- |
| 41 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Construction of five Habitation of Sirsakala Amebedker Villege of Selection year 1995 96
2009_CEUCZ_259_9 |
1819/ 293C/STP-KHI/Tender/09-10 DT. 17-8-09 |
26/08/2009 |
14/09/2009 |
15/09/2009 |
- |
No |
- |
| 42 |
Madhya Ganga Nahar Pariyojna, Irri. Dept ,Aligarh/Madhya Ganga Canal Contruction Circle, Bulandshahr |
construction of head cum cross regulator of Bahjoi branch and head regulator of Chandosi branch of the tail of main canal of madhya ganga canal stage_II
2009_MGNPA_257_1 |
02(A)/SE/2009_10 |
21/08/2009 |
28/08/2009 |
28/08/2009 |
- |
No |
- |
| 43 |
U P Jal Nigam/U.P. Jal Nigam |
SUPPLY OF ISI Marked A C Pressure Pipes and A C Couplings
2009_UPJNM_250_1 |
2000/PC/ADVT(2121-0146)/2009/37 |
12/08/2009 |
02/09/2009 |
02/09/2009 |
- |
No |
- |
| 44 |
UP New and Renewable Energy Development Agency/UP New and Renewable Energy Development Agency,HO |
SOLAR LANTERN
2009_UPNED_247_1 |
UPNEDA-PVSL/09 |
08/08/2009 |
08/09/2009 |
08/09/2009 |
- |
No |
- |
| 45 |
UP New and Renewable Energy Development Agency/UP New and Renewable Energy Development Agency,HO |
SOLAR STREET LIGHT
2009_UPNED_245_1 |
UPNEDA/PVSSL(CFL)/09 |
08/08/2009 |
08/09/2009 |
08/09/2009 |
- |
No |
- |
| 46 |
UP New and Renewable Energy Development Agency/UP New and Renewable Energy Development Agency,HO |
SOLAR HOME LIGHT
2009_UPNED_243_1 |
UPNEDA-PVHLS-II(CFL)/09 |
07/08/2009 |
08/09/2009 |
08/09/2009 |
- |
No |
- |
| 47 |
UP New and Renewable Energy Development Agency/UP New and Renewable Energy Development Agency,HO |
SOLAR POWER GENERATORS
2009_UPNED_241_1 |
UPNEDA/SPG/2009 |
07/08/2009 |
08/09/2009 |
08/09/2009 |
- |
No |
- |
| 48 |
Madhya Ganga Nahar Pariyojna, Irri. Dept ,Aligarh/Madhya Ganga Canal Contruction Circle, Bulandshahr |
Construction of Head cum cross regulator of Bahjoi branch and head regulator of Chandousi branch at the tail of Madhya Ganga main Canal Stage II
2009_MGNPA_240_1 |
02/SE/2009_10 |
04/08/2009 |
10/08/2009 |
12/08/2009 |
- |
No |
- |
| 49 |
Directorate of Industries/Directorate of Industries |
FLOURSCENT LAMPS
2009_UPDOI_239_1 |
72(E)/SPS-7-ET/RC-2009-10 |
31/07/2009 |
31/08/2009 |
31/08/2009 |
- |
No |
- |
| 50 |
Directorate of Industries/Directorate of Industries |
LEAD ACID STORAGE BATTERIES
2009_UPDOI_238_1 |
71(E)/SPS-7-ET/RC-2009-10 |
31/07/2009 |
31/08/2009 |
31/08/2009 |
- |
No |
- |
| 51 |
Directorate of Industries/Directorate of Industries |
UPS
2009_UPDOI_237_1 |
73(E)/SPS-7-ET/RC-2009-10 |
31/07/2009 |
31/08/2009 |
31/08/2009 |
- |
No |
- |
| 52 |
Directorate of Industries/Directorate of Industries |
ANILOPHOS
2009_UPDOI_236_1 |
70(G)/SPS-7-ET/RC-2009-10 |
29/07/2009 |
31/08/2009 |
31/08/2009 |
- |
No |
- |
| 53 |
Directorate of Industries/Directorate of Industries |
KHAKI PUGREE COTTON CLOTH
2009_UPDOI_233_1 |
67(C)/SPS-7-ET/QC-2009-10 |
29/07/2009 |
18/08/2009 |
18/08/2009 |
- |
No |
- |
| 54 |
Directorate of Industries/Directorate of Industries |
KHAKI WEB ANKELTS
2009_UPDOI_234_1 |
68(C)/SPS-7-ET/QC-2009-10 |
29/07/2009 |
18/08/2009 |
18/08/2009 |
- |
No |
- |
| 55 |
Directorate of Industries/Directorate of Industries |
KHAKI WEB HAVERSACK
2009_UPDOI_235_1 |
69(C)/SPS-7-ET/QC-2009-10 |
29/07/2009 |
18/08/2009 |
18/08/2009 |
- |
No |
- |
| 56.2 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
Maintenance of Parivartan Chawk and Baba Saheb Bheem Rao Ambedkar Pratima Sthal Group C 2009_CEUCZ_232_3 |
8715/523C-LO/TENDER/09 |
25/07/2009 |
28/07/2009 |
28/07/2009 |
- |
No |
- |
| 56 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
Maintenance of Parivartan Chawk and Baba Saheb Bheem Rao Ambedkar Pratima Sthal Group B
2009_CEUCZ_232_2 |
8715/523C-LO/TENDER/09 |
25/07/2009 |
28/07/2009 |
28/07/2009 |
- |
No |
- |
| 56.1 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
Maintenance of Parivartan Chawk and Baba Saheb Bheem Rao Ambedkar Pratima Sthal Group A
2009_CEUCZ_232_1 |
8715/523C-LO/TENDER/09 |
25/07/2009 |
28/07/2009 |
28/07/2009 |
- |
No |
- |
| 57 |
Directorate of Industries/Directorate of Industries |
SCIENTIFIC ANALYTICAL INSTRUMENT PART II 2009_UPDOI_231_1 |
65(A)/SPS-7-ET/RC-2009-10 |
21/07/2009 |
24/08/2009 |
24/08/2009 |
- |
No |
- |
| 58 |
Directorate of Industries/Directorate of Industries |
SEMI MOULDED 2009_UPDOI_230_1 |
66(A)/SPS-7-ET/RC-2009-10 |
21/07/2009 |
24/08/2009 |
24/08/2009 |
- |
No |
- |
| 59 |
Directorate of Industries/Directorate of Industries |
KIT BOX AND STEEL TRUNKS 2009_UPDOI_229_1 |
64(A)/SPS-7-ET/RC-2009-10 |
21/07/2009 |
24/08/2009 |
24/08/2009 |
- |
No |
- |
| 60 |
Directorate of Industries/Directorate of Industries |
STEEL ALMIRAH 2009_UPDOI_228_1 |
63(A)/SPS-7-ET/RC-2009-10 |
21/07/2009 |
18/08/2009 |
18/08/2009 |
- |
No |
- |
| 61 |
Directorate of Industries/Directorate of Industries |
COTTON PUGREE CLOTH DYED NEPTHAL RED 2009_UPDOI_227_1 |
62(C)/SPS-7-ET/QC-2009-10 |
21/07/2009 |
12/08/2009 |
12/08/2009 |
- |
No |
- |
| 62 |
Directorate of Industries/Directorate of Industries |
STREPTOMYCINE SULPHATE 2009_UPDOI_226_1 |
61(G)/SPS-7-ET/RC-2009-10 |
21/07/2009 |
24/08/2009 |
24/08/2009 |
- |
No |
- |
| 63 |
Directorate of Industries/Directorate of Industries |
FIRE AND NON FIRE SAFE 2009_UPDOI_225_1 |
60(A)/SPS-7-ET/RC-2009-10 |
20/07/2009 |
20/08/2009 |
20/08/2009 |
- |
No |
- |
| 64 |
Directorate of Industries/Directorate of Industries |
HOSPITAL FURNITURE PART2 2009_UPDOI_224_1 |
59(A)/SPS-7-ET/RC-2009-10 |
20/07/2009 |
20/08/2009 |
20/08/2009 |
- |
No |
- |
| 65 |
Directorate of Industries/Directorate of Industries |
HOSPITAL FURNITURE PART1 2009_UPDOI_223_1 |
58(A)/SPS-7-ET/RC-2009-10 |
20/07/2009 |
20/08/2009 |
20/08/2009 |
- |
No |
- |
| 66 |
Directorate of Industries/Directorate of Industries |
BOOK SHELVES 2009_UPDOI_222_1 |
57(A)/SPS-7-ET/RC-2009-10 |
20/07/2009 |
17/08/2009 |
17/08/2009 |
- |
No |
- |
| 67 |
Directorate of Industries/Directorate of Industries |
STEEL RACK 2009_UPDOI_221_1 |
56(A)/SPS-7-ET/RC-2009-10 |
20/07/2009 |
17/08/2009 |
17/08/2009 |
- |
No |
- |
| 68 |
U P Jal Nigam/U.P. Jal Nigam |
Supply of ISI Marked PVC Ribbed Screens 2009_UPJNM_219_1 |
1456/PC/ADVT(2121-0146)/2009/23 |
14/07/2009 |
24/07/2009 |
24/07/2009 |
- |
No |
- |
| 69 |
Directorate of Industries/Directorate of Industries |
QUANTITY CONTRACT 2009_UPDOI_218_1 |
05/JDI-VAR/SPS-7-ET/QC-2009-10 |
10/07/2009 |
16/07/2009 |
16/07/2009 |
- |
No |
- |
| 70 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Etawah |
Widening and Strengthning of B P road km 280 to 290 2009_CEUKZ_217_1 |
2786B/etendering/Etawa Cir/09 |
01/07/2009 |
19/07/2009 |
20/07/2009 |
- |
No |
- |
| 71 |
Directorate of Industries/Directorate of Industries |
METHYL 2009_UPDOI_216_1 |
55(G)/SPS-7-ET/RC-2009-10 |
01/07/2009 |
30/07/2009 |
30/07/2009 |
- |
No |
- |
| 72 |
Directorate of Industries/Directorate of Industries |
MENCOZEB 2009_UPDOI_215_1 |
54(G)/SPS-7-ET/RC-2009-10 |
01/07/2009 |
30/07/2009 |
30/07/2009 |
- |
No |
- |
| 73 |
Directorate of Industries/Directorate of Industries |
LINDANE 2009_UPDOI_214_1 |
53(G)/SPS-7-ET/RC-2009-10 |
01/07/2009 |
30/07/2009 |
30/07/2009 |
- |
No |
- |
| 74 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Etawah |
Widening and Strengthning of B P road km 266 to 279 2009_CEUKZ_212_1 |
2786A/etendering/Etawa Cir/09 |
30/06/2009 |
19/07/2009 |
20/07/2009 |
- |
No |
- |
| 75 |
Directorate of Industries/Directorate of Industries |
FAX MACHINE 2009_UPDOI_211_1 |
52(E)/SPS-7-ET/RC-2009-10 |
30/06/2009 |
20/07/2009 |
20/07/2009 |
- |
No |
- |
| 76 |
Directorate of Industries/Directorate of Industries |
TUGESTON FILAMENT 2009_UPDOI_210_1 |
51(E)/SPS-7-ET/RC-2009-10 |
30/06/2009 |
20/07/2009 |
20/07/2009 |
- |
No |
- |
| 77 |
U P Irrigation Department (Mechanical)/Central Equipment and Stores Procurement |
For issue of Rate Contract for manufacture and supply of ISI Marked Polyester Enameled Round Copper Winding Wires 2009_UPIDM_206_1 |
TE-650/2009-10 |
25/06/2009 |
27/07/2009 |
27/07/2009 |
- |
No |
- |
| 78 |
Directorate of Industries/Directorate of Industries |
DICHLOROVAS 2009_UPDOI_208_1 |
50(G)/SPS-7-ET/RC-2009-10 |
25/06/2009 |
20/07/2009 |
20/07/2009 |
- |
No |
- |
| 79 |
Directorate of Industries/Directorate of Industries |
CARBRYL 2009_UPDOI_207_1 |
49(G)/SPS-7-ET/RC-2009-10 |
25/06/2009 |
20/07/2009 |
20/07/2009 |
- |
No |
- |
| 80 |
Directorate of Industries/Directorate of Industries |
WATTABLE SULPHAR 2009_UPDOI_204_1 |
48(G)/SPS-7-ET/RC-2009-10 |
20/06/2009 |
05/07/2009 |
05/07/2009 |
- |
No |
- |
| 81 |
Directorate of Industries/Directorate of Industries |
TEBUOCNAZOLE 2009_UPDOI_203_1 |
47(G)/SPS-7-ET/RC-2009-10 |
20/06/2009 |
05/07/2009 |
05/07/2009 |
- |
No |
- |
| 82 |
Directorate of Industries/Directorate of Industries |
MONOCROTOPHOS 2009_UPDOI_202_1 |
46(G)/SPS-7-ET/RC-2009-10 |
19/06/2009 |
05/07/2009 |
05/07/2009 |
- |
No |
- |
| 83 |
Directorate of Industries/Directorate of Industries |
METALAXYL 2009_UPDOI_201_1 |
45(G)/SPS-7-ET/RC-2009-10 |
19/06/2009 |
05/07/2009 |
05/07/2009 |
- |
No |
- |
| 84 |
Directorate of Industries/Directorate of Industries |
FENVALERATE 2009_UPDOI_200_1 |
44(G)/SPS-7-ET/RC-2009-10 |
19/06/2009 |
05/07/2009 |
05/07/2009 |
- |
No |
- |
| 85 |
Directorate of Industries/Directorate of Industries |
HEXA CANAZOLE 2009_UPDOI_199_1 |
43(G)/SPS-7-ET/RC-2009-10 |
19/06/2009 |
05/07/2009 |
05/07/2009 |
- |
No |
- |
| 86 |
Directorate of Industries/Directorate of Industries |
BUTACHLOR 2009_UPDOI_197_1 |
41(G)/SPS-7-ET/RC-2009-10 |
19/06/2009 |
05/07/2009 |
05/07/2009 |
- |
No |
- |
| 87 |
Directorate of Industries/Directorate of Industries |
CARBENDAZIM 2009_UPDOI_198_1 |
42(G)/SPS-7-ET/RC-2009-10 |
19/06/2009 |
05/07/2009 |
05/07/2009 |
- |
No |
- |
| 88 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Kanpur |
Widening and Strengthening of Chaubepur Bela Road KM 8 to 14 2009_CEUKZ_195_1 |
2784M/39M-KV/09 |
19/06/2009 |
03/07/2009 |
04/07/2009 |
- |
No |
- |
| 89 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Farrukhabad/Provincial Division, Kannauj |
Widening and Strengthening Of CSB Road from 21 to 31 KM 2009_CEUKZ_196_3 |
2315M/39M-FKV/09 |
19/06/2009 |
14/07/2009 |
15/07/2009 |
- |
No |
- |
| 89.1 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Farrukhabad/Provincial Division, Kannauj |
Widening and Strengthening Of CSB Road from 11 to 20 KM 2009_CEUKZ_196_2 |
2315M/39M-FKV/09 |
19/06/2009 |
14/07/2009 |
15/07/2009 |
- |
No |
- |
| 89.2 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Farrukhabad/Provincial Division, Kannauj |
Widening and Strengthening Of CSB Road from 1 to 10 KM 2009_CEUKZ_196_1 |
2315M/39M-FKV/09 |
19/06/2009 |
14/07/2009 |
15/07/2009 |
- |
No |
- |
| 90 |
Directorate of Industries/Directorate of Industries |
THIOPHANATE METHYLE 2009_UPDOI_194_1 |
40(G)/SPS-7-ET/RC-2009-10 |
10/06/2009 |
30/06/2009 |
30/06/2009 |
- |
No |
- |
| 91 |
Directorate of Industries/Directorate of Industries |
SIESEL ROPE 2009_UPDOI_193_1 |
39(C)/SPS-7-ET/RC-2009-10 |
10/06/2009 |
16/06/2009 |
16/06/2009 |
- |
No |
- |
| 92 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Unnao |
Renewal of MMU Road (MDR - 52). (In Km 18, 22, 24, 25, 27, 31, 35 37(700), 54, 61 to 65) 2009_CEUCZ_192_1 |
2311/CASH/1MT-UNNAO/09 |
09/06/2009 |
11/06/2009 |
12/06/2009 |
- |
No |
- |
| 93 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Unnao |
Renewal of BUA Road SH-38. (Km 99 to 104, 112(550), 113, 115 to 125, 131, 132, 140) 2009_CEUCZ_191_1 |
2312/CASH/1MT-UNNAO/09 |
09/06/2009 |
11/06/2009 |
12/06/2009 |
- |
No |
- |
| 94 |
Directorate of Printing and Stationery AllahabadUP/Department of Printing and Stationery |
Supply of White Offset Printing Paper 60 GSM and 80 GSM Flat and Reel 2009_DPSUP_189_1 |
06_P_09_10 |
03/06/2009 |
03/07/2009 |
03/07/2009 |
- |
No |
- |
| 95 |
Directorate of Printing and Stationery AllahabadUP/Department of Printing and Stationery |
Supply of Country Jute Twin - Sutli 2009_DPSUP_188_2 |
04_RM_09_10 |
03/06/2009 |
13/07/2009 |
13/07/2009 |
- |
No |
- |
| 95.1 |
Directorate of Printing and Stationery AllahabadUP/Department of Printing and Stationery |
Supply of Hessian Cloth 2009_DPSUP_188_1 |
04_RM_09_10 |
03/06/2009 |
13/07/2009 |
13/07/2009 |
- |
No |
- |
| 96 |
Directorate of Industries/Directorate of Industries |
QUANTITY CONTRACT 2009_UPDOI_187_1 |
04/JDI-VAR/SPS-7-ET/QC-2009-10 |
03/06/2009 |
08/06/2009 |
08/06/2009 |
- |
No |
- |
| 97 |
Directorate of Industries/Directorate of Industries |
QUANTITY CONTRACT 2009_UPDOI_186_1 |
03/JDI-VAR/SPS-7-ET/QC-2009-10 |
03/06/2009 |
08/06/2009 |
08/06/2009 |
- |
No |
- |
| 98 |
Directorate of Industries/Directorate of Industries |
CROP PROTECTION EQUIPMENTS 2009_UPDOI_185_1 |
38(K)/SPS-7-ET/RC/2009-10 |
29/05/2009 |
12/06/2009 |
12/06/2009 |
- |
No |
- |
| 99 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Unnao |
Renewal and patch Repair (M.M.U. road Km 18, 22, 24, 25, 27, 31, 35, 37(700), 54, 61 to 65) Year 2009-10 2009_CEUCZ_184_1 |
207CAMP-SE UNNAO CIR/TENDER/09 |
23/05/2009 |
01/06/2009 |
02/06/2009 |
- |
No |
- |
| 100 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Unnao |
Renewal and patch Repair (BUA road Km 99 to 104 112(550) 113 115 to 125 131 132 140) Year 2009 10 2009_CEUCZ_183_1 |
206/CAMP-SE UNNAO CIR/TENDER/09 |
23/05/2009 |
01/06/2009 |
02/06/2009 |
- |
No |
- |
| 101 |
Directorate of Industries/Directorate of Industries |
QUANTITY CONTRACT 2009_UPDOI_181_1 |
01/JDI-VAR/SPS-7-ET/QC-2009-10 |
22/05/2009 |
02/06/2009 |
02/06/2009 |
- |
No |
- |
| 102 |
Directorate of Industries/Directorate of Industries |
STEEL FURNITURE 2009_UPDOI_180_1 |
37(A)/SPS-7-ET/RC-2009-10 |
22/05/2009 |
18/06/2009 |
18/06/2009 |
- |
No |
- |
| 103 |
Directorate of Industries/Directorate of Industries |
TUNGESTAN FILAMENT 2009_UPDOI_179_1 |
36(E)/SPS-7-ET/RC-2009-10 |
22/05/2009 |
05/06/2009 |
05/06/2009 |
- |
No |
- |
| 104 |
Directorate of Industries/Directorate of Industries |
FAX MACHINE 2009_UPDOI_178_1 |
35(E)/SPS-7-ET/RC-2009-10 |
22/05/2009 |
05/06/2009 |
05/06/2009 |
- |
No |
- |
| 105 |
Directorate of Industries/Directorate of Industries |
QUANTITY CONTRACT 2009_UPDOI_182_1 |
02/JDI-VAR/SPS-7-ET/QC-2009-10 |
22/05/2009 |
02/06/2009 |
02/06/2009 |
- |
No |
- |
| 106 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/Construction Division-1, Lucknow |
Construction of 3x12 m span Bridge of Lucknow Kursi Mahmudabad Road in Km 12 2009_CEUCZ_177_2 |
5610/523c-Lo /Tender |
17/05/2009 |
22/05/2009 |
23/05/2009 |
- |
No |
- |
| 106.1 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/Construction Division-1, Lucknow |
Widening and strengthening of Sitapur Road to Air force station BKT Road 2009_CEUCZ_177_1 |
5610/523c-Lo /Tender |
17/05/2009 |
22/05/2009 |
23/05/2009 |
- |
No |
- |
| 107 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Cons of Sarjupurwa Link Road Zero to Top Coat under Dr Amb Gramin Samagra Vikas Yojna 2009 10 5 00 Km 2009_CEUCZ_176_1 |
2338 /etender/stp.cir/2009-10 |
16/05/2009 |
26/05/2009 |
27/05/2009 |
- |
No |
- |
| 108 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/Construction Division-1, Lucknow |
Widening and Strengthening of Sitapur Road to BKT tahsil shramdan Road 2009_CEUCZ_175_1 |
5610/523C-LO/Tender |
16/05/2009 |
22/05/2009 |
23/05/2009 |
- |
No |
- |
| 109 |
U P Irrigation Department (Mechanical)/Central Equipment and Stores Procurement |
FOR ISSUE OF RATE CONTRACT FOR MANUFACTURE AND SUPPLY OF ISI MARKED PERCWW IN IRRIGATION MECH DEPARTMENT UP 2009_UPIDM_174_1 |
TE-646/2009-10 |
15/05/2009 |
16/06/2009 |
16/06/2009 |
- |
No |
- |
| 110 |
Directorate of Industries/Directorate of Industries |
PENDIMETHILIN 2009_UPDOI_173_1 |
34(G)/SPS-7-ET/RC-2009-10 |
13/05/2009 |
27/05/2009 |
27/05/2009 |
- |
No |
- |
| 111 |
Directorate of Industries/Directorate of Industries |
ANILOPHOS 2009_UPDOI_172_1 |
33(G)/SPS-7-ET/RC-2009-10 |
13/05/2009 |
27/05/2009 |
27/05/2009 |
- |
No |
- |
| 112 |
Directorate of Industries/Directorate of Industries |
RCC PIPE 2009_UPDOI_171_1 |
32(G)/SPS-7-ET/RC-2009-10 |
13/05/2009 |
02/06/2009 |
02/06/2009 |
- |
No |
- |
| 113 |
Directorate of Industries/Directorate of Industries |
DIMETHOATE 2009_UPDOI_170_1 |
31(G)/SPS-7-ET/RC-2009-10 |
13/05/2009 |
27/05/2009 |
27/05/2009 |
- |
No |
- |
| 114 |
NICOrganisationCEzone-Test |
boq1 2009_xxx_169_1 |
Test/29 |
29/04/2009 |
29/04/2009 |
29/04/2009 |
- |
No |
- |
| 115 |
NICOrganisationCEzone-Test |
Test29 2009_xxx_168_1 |
Test29 |
29/04/2009 |
29/04/2009 |
29/04/2009 |
- |
No |
- |
| 116 |
Directorate of Printing and Stationery AllahabadUP/Department of Printing and Stationery |
Supply of White Offset Printing Paper 60 G.S.M. and 80 G.S.M. (Flat/Reel) 2009_DPSUP_166_2 |
IFB_01_P_09_10 |
21/04/2009 |
22/05/2009 |
22/05/2009 |
- |
No |
- |
| 116.1 |
Directorate of Printing and Stationery AllahabadUP/Department of Printing and Stationery |
Supply of Cream Wove Paper 60 G.S.M. (Flat/Reel) 2009_DPSUP_166_1 |
IFB_01_P_09_10 |
21/04/2009 |
09/06/2009 |
09/06/2009 |
- |
No |
- |
| 117 |
Directorate of Industries/Directorate of Industries |
PVC PIPE 2009_DI_165_1 |
30(G)/SPS-7-ET/RC-2009-10 |
16/04/2009 |
04/05/2009 |
04/05/2009 |
- |
No |
- |
| 118 |
U P Jal Nigam/U.P. Jal Nigam |
Supply of ISI Marked G I Pipes 2009_UPJN_164_1 |
493/Purchase/Advt/(2121-0146) 2009/05 |
09/04/2009 |
14/05/2009 |
14/05/2009 |
- |
No |
- |
| 119.2 |
UP Electronics Corporation Ltd./UPLC HQ |
Empanelment Of Registered Companies in the field of IT 2008_UPLC_35_1 |
UPLC/Software/Empanelment-01/2008 |
07/04/2009 |
01/05/2009 |
02/05/2009 |
- |
No |
- |
| 120 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
ABHAYPUR TO AKTHI LINK ROAD 2009_UPPWD_162_1 |
1735/etender/cd1kheri/09 |
31/03/2009 |
20/04/2009 |
21/04/2009 |
- |
No |
- |
| 121 |
Directorate of Industries/Directorate of Industries |
CREAMVOVE PAPER 2009_DI_161_1 |
29(M)/SPS-7-ET/RC-2008-09 |
26/03/2009 |
08/04/2009 |
08/04/2009 |
- |
No |
- |
| 122 |
Directorate of Industries/Directorate of Industries |
WHITE OFFSET PRINTING PAPER 2009_DI_160_1 |
28(M)/SPS-7-ET/RC-2008-09 |
25/03/2009 |
08/04/2009 |
08/04/2009 |
- |
No |
- |
| 123 |
Directorate of Industries/Directorate of Industries |
DUPLICATING PAPER 2009_DI_159_1 |
27(M)/SPS-7-ET/RC-2008-09 |
25/03/2009 |
08/04/2009 |
08/04/2009 |
- |
No |
- |
| 124 |
Directorate of Industries/Directorate of Industries |
KRAFT PAPER 2009_DI_158_1 |
26(M)/SPS-7-ET/RC-2008-09 |
25/03/2009 |
08/04/2009 |
08/04/2009 |
- |
No |
- |
| 125 |
Directorate of Industries/Directorate of Industries |
DRAWING PAPER 2009_DI_157_1 |
25(M)/SPS-7-ET/RC-2008-09 |
25/03/2009 |
08/04/2009 |
08/04/2009 |
- |
No |
- |
| 126 |
Directorate of Industries/Directorate of Industries |
ART PAPER 2009_DI_156_1 |
24(M)/SPS-7-ET/RC-2008-09 |
25/03/2009 |
08/04/2009 |
08/04/2009 |
- |
No |
- |
| 127 |
Directorate of Industries/Directorate of Industries |
TYPE PAPER 2009_DI_153_1 |
21(M)/SPS-7-ET/RC-2008-09 |
25/03/2009 |
08/04/2009 |
08/04/2009 |
- |
No |
- |
| 128 |
Directorate of Industries/Directorate of Industries |
TRACING PAPER 2009_DI_154_1 |
22(M)/SPS-7-ET/RC-2008-09 |
25/03/2009 |
08/04/2009 |
08/04/2009 |
- |
No |
- |
| 129 |
Directorate of Industries/Directorate of Industries |
PHOTOCOPIER PAPER 2009_DI_155_1 |
23(M)/SPS-7-ET/RC-2008-09 |
25/03/2009 |
08/04/2009 |
08/04/2009 |
- |
No |
- |
| 130 |
Directorate of Industries/Directorate of Industries |
MAPLITHO PAPER 2009_DI_152_1 |
20(M)/SPS-7-ET/RC-2008-09 |
25/03/2009 |
08/04/2009 |
08/04/2009 |
- |
No |
- |
| 131 |
Directorate of Industries/Directorate of Industries |
ZINEB 2009_DI_151_1 |
19(G)/SPS-7-ET/RC-2008-09 |
17/03/2009 |
02/04/2009 |
02/04/2009 |
- |
No |
- |
| 132 |
Directorate of Industries/Directorate of Industries |
ALPHA NAPTHYL ACITIC ACID 2009_DI_150_1 |
18(G)/SPS-7-ET/RC-2008-09 |
17/03/2009 |
02/04/2009 |
02/04/2009 |
- |
No |
- |
| 133 |
Directorate of Industries/Directorate of Industries |
THIRAM 2009_DI_149_1 |
17(G)/SPS-7-ET/RC-2008-09 |
17/03/2009 |
02/04/2009 |
02/04/2009 |
- |
No |
- |
| 134 |
Directorate of Industries/Directorate of Industries |
NPVH 2009_DI_148_1 |
16(G)/SPS-7-ET/RC-2008-09 |
16/03/2009 |
02/04/2009 |
02/04/2009 |
- |
No |
- |
| 135 |
Directorate of Industries/Directorate of Industries |
CARBENDAZIM 2009_DI_147_1 |
15(G)/SPS-7-ET/RC-2008-09 |
16/03/2009 |
02/04/2009 |
02/04/2009 |
- |
No |
- |
| 136 |
Directorate of Industries/Directorate of Industries |
MALATHION 2009_DI_146_1 |
14(G)/SPS-7-ET/RC-2008-09 |
16/03/2009 |
02/04/2009 |
02/04/2009 |
- |
No |
- |
| 137 |
Directorate of Industries/Directorate of Industries |
LINDANE GRANUAL 2009_DI_145_1 |
13(G)/SPS-7-ET/RC-2008-09 |
16/03/2009 |
02/04/2009 |
02/04/2009 |
- |
No |
- |
| 138 |
Directorate of Industries/Directorate of Industries |
ATRAZINE 2009_DI_144_1 |
12(G)/SPS-7-ET/RC-2008-09 |
16/03/2009 |
02/04/2009 |
02/04/2009 |
- |
No |
- |
| 139 |
Directorate of Industries/Directorate of Industries |
CARTAP HYDROCHLORIDE 2009_DI_143_1 |
11(G)/SPS-7-ET/RC-2008-09 |
16/03/2009 |
02/04/2009 |
02/04/2009 |
- |
No |
- |
| 140 |
Directorate of Industries/Directorate of Industries |
METHYL PARATHION 2009_DI_142_1 |
10(G)/SPS-7-ET/RC-2008-09 |
16/03/2009 |
02/04/2009 |
02/04/2009 |
- |
No |
- |
| 141 |
Directorate of Industries/Directorate of Industries |
TRICHODERMA HARZIAUM 2009_DI_141_1 |
09(G)/SPS-7-ET/RC-2008-09 |
16/03/2009 |
02/04/2009 |
02/04/2009 |
- |
No |
- |
| 142 |
Directorate of Industries/Directorate of Industries |
THIOPHANATE METHILE 2009_DI_140_1 |
08(G)/SPS-7-ET/RC-2008-09 |
16/03/2009 |
02/04/2009 |
02/04/2009 |
- |
No |
- |
| 143.1 |
UP Electronics Corporation Ltd./UPLC HQ |
Empanelment Of Registered Companies in the field of IT 2009_UPLC_139_1 |
UPLC/Software/Empanelment-01/2008 |
06/03/2009 |
04/04/2009 |
04/04/2009 |
- |
No |
- |
| 144 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
PC and Seal Coat work with Hot Mix Plant on village roads Dr Ambedkar Yojana 2009 10 2009_UPPWD_138_1 |
1309 /293 C-STP/TENDER/08 |
02/03/2009 |
07/03/2009 |
07/03/2009 |
- |
No |
- |
| 145 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Construction of Year 2009 10 Ambedkar Village Shivpuri Link Road Ch Km 0 00 to Km 3 80 380 Km 2009_UPPWD_137_1 |
1308 /293C-STP/TENDER/08 |
02/03/2009 |
07/03/2009 |
07/03/2009 |
- |
No |
- |
| 146 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
PC and Seal Coat work with HMP on village roads Dr. Ambedkar Yojana 2009 10 Construction and Reconstruction of roads 2009_UPPWD_135_1 |
1306/293C-STP-TENDER/08 |
02/03/2009 |
07/03/2009 |
07/03/2009 |
- |
No |
- |
| 147 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
PC and Seal Coat work with HMP on village roads Dr Ambedkar Yojana 2009 10 Construction and Reconstruction of roads 2009_UPPWD_136_1 |
1307 /293C-STP/TENDER/08 |
02/03/2009 |
07/03/2009 |
07/03/2009 |
- |
No |
- |
| 148 |
U P Irrigation Department (Mechanical)/Central Equipment and Stores Procurement |
MANUFACTURE AND SUPPLY OF ISI MARKED V WIRE WOUND SCREEN DIA 150MM 2009_CESPO_134_1 |
TE-644/2008-09 |
28/02/2009 |
18/04/2009 |
18/04/2009 |
- |
No |
- |
| 149 |
U P Irrigation Department (Mechanical)/Central Equipment and Stores Procurement |
MANUFACTURE AND SUPPLY OF ISI MARKED PVC PIPE 200MM 2009_CESPO_133_2 |
TE-643/2008-09 |
28/02/2009 |
17/04/2009 |
17/04/2009 |
- |
No |
- |
| 150 |
U P Irrigation Department (Mechanical)/Central Equipment and Stores Procurement |
MANUFACTURE AND SUPPLY OF ISI MARKED PVC PIPE 160MM 2009_CESPO_130_1 |
TE-642/2008-09 |
28/02/2009 |
16/04/2009 |
16/04/2009 |
- |
No |
- |
| 151 |
Shreetron India Limited/Shreetron India Limited |
EMPANELMENT OF OEM SINGLE AUTHORISED DEALERS OF COMPUTER SYSTEMS FOR THE SUPPLY AND INSTALLATION OF COMPUTERS AND RELATED ITEMS 2009_SIL_132_1 |
EMP-SIL/01/2008-09 |
28/02/2009 |
08/04/2009 |
08/04/2009 |
- |
No |
- |
| 152 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Repair and Renewal of village Roads by 20mm PC and Seal coat in Block Machhrehta Gondlamau Khairabad Misrikh in Year 2009 10 As per BOQ 2009_UPPWD_131_1 |
1262/ 293C-STP / Tender/08-09 |
28/02/2009 |
06/03/2009 |
07/03/2009 |
- |
No |
- |
| 153 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Construction of Year 2009 10 Ambedkar Village Sanwanipur Link Road Ch Km 0.00 to Km 3.50 (3.50 Km.) 2009_UPPWD_129_1 |
1182 /293 C/STP-LMP-TENDER/08 |
27/02/2009 |
02/03/2009 |
03/03/2009 |
- |
No |
- |
| 154 |
U P Irrigation Department (Mechanical)/Central Equipment and Stores Procurement |
ISI MARKED POLYESTER ERCWW IN VARIOUS TUBEWELL DIV OF IDUP 2009_CESPO_124_2 |
TE-645/2008-09 |
26/02/2009 |
05/05/2009 |
05/05/2009 |
- |
No |
- |
| 155 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
PC and Seal Coat work with Hot Mix Plant on village roads Dr Ambedkar Yojana 2009 10 Construction and Reconstruction of roads as listed 2009_UPPWD_126_1 |
1173 /293C-STP/TENDER/08 |
26/02/2009 |
28/02/2009 |
01/03/2009 |
- |
No |
- |
| 156 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
PC and Seal Coat work with Hot Mix Plant on village roads Dr Ambedkar Yojana 2009 10 2009_UPPWD_128_1 |
1174 /293 C-STP/TENDER/08 |
26/02/2009 |
28/02/2009 |
01/03/2009 |
- |
No |
- |
| 157 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Construction of Year 2009 10 Ambedkar Village Bilsuwa Link Road Ch Km 0 00 to Km 4 250 4 25 Km 2009_UPPWD_125_1 |
1175/293C-STP-TENDER/08 |
26/02/2009 |
28/02/2009 |
01/03/2009 |
- |
No |
- |
| 158 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Construction of Year 2009 10 Ambedkar Village Shivpuri Link Road Ch Km 0 00 to Km 3 80 2009_UPPWD_127_1 |
1176 /293C-STP/TENDER/08 |
26/02/2009 |
28/02/2009 |
01/03/2009 |
- |
No |
- |
| 159 |
U P Irrigation Department (Mechanical)/Central Equipment and Stores Procurement |
Supply of Automatic Air Break Star Delta Starters 2009_CESPO_109_1 |
TE-641/2008-09 |
25/02/2009 |
02/05/2009 |
02/05/2009 |
- |
No |
- |
| 160 |
U P Irrigation Department (Mechanical)/Central Equipment and Stores Procurement |
Submersible Pumpsets 1Cusec 15M to 24M Head 2009_CESPO_112_2 |
TE-636/08-09 |
24/02/2009 |
18/05/2009 |
18/05/2009 |
- |
No |
- |
| 161 |
U P Irrigation Department (Mechanical)/Central Equipment and Stores Procurement |
Submersible Pumpsets 1Cusec 27M to 48M Head 2009_CESPO_115_1 |
TE-637/2008-09 |
24/02/2009 |
19/05/2009 |
19/05/2009 |
- |
No |
- |
| 162 |
U P Irrigation Department (Mechanical)/Central Equipment and Stores Procurement |
Submersible Pumpset of 1.5Cusec 15M to 24M head 2009_CESPO_118_1 |
TE-638/2008-09 |
24/02/2009 |
20/05/2009 |
20/05/2009 |
- |
No |
- |
| 163 |
U P Irrigation Department (Mechanical)/Central Equipment and Stores Procurement |
Submersible Pumpset of 1.5Cusec 27M to 48M head 2009_CESPO_119_1 |
TE-639/2008-09 |
24/02/2009 |
21/05/2009 |
21/05/2009 |
- |
No |
- |
| 164.1 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Prov and laying PC 20mm and Type A seal coat Over Black top surface For renawal of village roads renewal 2009 10 2009_UPPWD_123_1 |
1CAMP/594C-STP/Tender/08-09 |
23/02/2009 |
28/02/2009 |
28/02/2009 |
- |
No |
- |
| 165 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Prov and laying PC 20mm and Type A seal coat over black Top road under repaire of Dr Ambedkar Gramin Ssmagra Vikas Yojana 2009_UPPWD_121_1 |
1CAMP/594C-STP/Tender/08 09 |
23/02/2009 |
28/02/2009 |
28/02/2009 |
- |
No |
- |
| 166 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Providing and laying PC 20mm and Type A seal coat Over WBM surface For new constructed roads Dr Ambedkar Gramin Samagra Vikas 2009 10 2009_UPPWD_122_1 |
1CAMP/594C-STP/Tender/08-09 |
23/02/2009 |
28/02/2009 |
28/02/2009 |
- |
No |
- |
| 167 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
CONSTRUCTION OF APPROACH ROAD UPTO HOUSING SCHEME OF AVAS VIKAS PARISHAD UNDER HON DR KASHIRAM SHAHRI GARIB AVAS YOJNA IN KHERI TOWN AREA 2009_UPPWD_120_1 |
1CAMP/294C/STP-LMP/TENDER/08 |
23/02/2009 |
28/02/2009 |
28/02/2009 |
- |
No |
- |
| 168 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
ABHAYPUR TO AKTHI LINK ROAD 2009_UPPWD_117_1 |
1157/etender/kheri/08-09 |
21/02/2009 |
24/02/2009 |
25/02/2009 |
- |
No |
- |
| 169 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Repair and Renewal of village Roads by 20mm PC and Seal coat With H M P in Block Machhrehta Gondlamau KhairabadMisrikh in Year 2009-10 As per BOQ 2009_UPPWD_116_1 |
1158/293c-STP/ Tender/08 |
21/02/2009 |
25/02/2009 |
26/02/2009 |
- |
No |
- |
| 170 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Renewal work by SDBC in Km 17 to 35 of Palia Lucknow road SH 25 2009_UPPWD_114_1 |
1044 STP-LMP/Tender/08-09 |
20/02/2009 |
26/02/2009 |
27/02/2009 |
- |
No |
- |
| 171 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Renewal work by SDBC in Km 21 to 39 of Lakhimpur Bijuwa Bheera Road 0.3 2009_UPPWD_113_1 |
1043/STP-LMP /Tender/08-09 |
20/02/2009 |
26/02/2009 |
27/02/2009 |
- |
No |
- |
| 172 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
Widening and Strengthening of Jail Road to VIP Road Behind Manyar Kanshiram Smarak Ch 0 000 0 600 2009_UPPWD_110_1 |
2429/523C-lkoCir/08-09 |
20/02/2009 |
21/02/2009 |
21/02/2009 |
- |
No |
- |
| 173 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
Widening and Strengthening of Jail Road to VIP Road Behind Manyar Kanshiram Smarak CH 0 600 2 100 2009_UPPWD_111_1 |
2430/523C-LKO.CIR/08-09 |
20/02/2009 |
21/02/2009 |
21/02/2009 |
- |
No |
- |
| 174 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
Construction of 6 Lane Road Lohia Path Gomti Bairaj to Ring Road Khurram Nagar via Kukrail Nala 2009_UPPWD_106_1 |
2365 /523c-LO /Tender |
19/02/2009 |
20/02/2009 |
20/02/2009 |
- |
No |
- |
| 175 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
Remaining Part of Widening and Strengthening Of IMK Deva Chinhat Road Km 46 to 52 under Rajaya sadak Nidhi 2009_UPPWD_107_1 |
2366/523C-Lo /Tender |
19/02/2009 |
20/02/2009 |
20/02/2009 |
- |
No |
- |
| 176 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
Construction of Internal Road and Central Verge in Manyvar Kanshiram Smarak and Geetapalli Ababi alongwith Smarak Boundary Wall 600 m 2009_UPPWD_108_1 |
2367 /523C-LKO.CIR /Tender/09 |
19/02/2009 |
20/02/2009 |
20/02/2009 |
- |
No |
- |
| 177 |
Directorate of Printing and Stationery AllahabadUP/Department of Printing and Stationery |
Supply of Wire Stitching Machine 1 inch 2009_DPSUP_104_5 |
08/M/08-09 |
18/02/2009 |
05/03/2009 |
05/03/2009 |
- |
No |
- |
| 177.1 |
Directorate of Printing and Stationery AllahabadUP/Department of Printing and Stationery |
Supply of Wire Stitching Machine Half Inch 2009_DPSUP_104_4 |
08/M/08-09 |
18/02/2009 |
05/03/2009 |
05/03/2009 |
- |
No |
- |
| 177.2 |
Directorate of Printing and Stationery AllahabadUP/Department of Printing and Stationery |
Supply of A-1 Size Dampening Washing Machine 2009_DPSUP_104_3 |
08/M/08-09 |
18/02/2009 |
05/03/2009 |
05/03/2009 |
- |
No |
- |
| 177.3 |
Directorate of Printing and Stationery AllahabadUP/Department of Printing and Stationery |
Supply of Buckle Folding Machine 2009_DPSUP_104_2 |
08/M/08-09 |
18/02/2009 |
05/03/2009 |
05/03/2009 |
- |
No |
- |
| 177.4 |
Directorate of Printing and Stationery AllahabadUP/Department of Printing and Stationery |
Supply of Automatic Disc Ruling Size 36 inches Machine with both side ruling facilities 2009_DPSUP_104_1 |
08/M/08-09 |
18/02/2009 |
05/03/2009 |
05/03/2009 |
- |
No |
- |
| 178 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Renewal of LBB Road SH 90 Km 1 to 20 with SDBC Year 2009 10 2009_UPPWD_105_1 |
997 /STP-LMP/TENDER/09 |
18/02/2009 |
24/02/2009 |
25/02/2009 |
- |
No |
- |
| 179 |
Directorate of Industries/Directorate of Industries |
PAD LOCK 2009_DI_103_1 |
06(K)/SPS-7-ET/RC-2008-09 |
17/02/2009 |
03/03/2009 |
03/03/2009 |
- |
No |
- |
| 180 |
Directorate of Industries/Directorate of Industries |
CARTRIDGE PAPER 2009_DI_102_1 |
05(M)/SPS-7-ET/RC-2008-09 |
17/02/2009 |
02/03/2009 |
02/03/2009 |
- |
No |
- |
| 181 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
Improvement of Baba Saheb Dr Bhim Rao Ambedkar Samajik Parivartan Sthal Chauraha on Lohiapath 2009_UPPWD_101_1 |
2185 /523C-Lko Cir /Tender/08-09 |
16/02/2009 |
19/02/2009 |
20/02/2009 |
- |
No |
- |
| 182 |
Directorate of Industries/Directorate of Industries |
RATE CONTRACT FOR AZADIRACTIN 2009_DI_100_1 |
TENDER NO.04(G)/SPS-7-ET/RC-2008-09 |
13/02/2009 |
27/02/2009 |
27/02/2009 |
- |
No |
- |
| 183 |
Directorate of Industries/Directorate of Industries |
BRASS SEAL 2009_DI_99_1 |
SHORT TERM TENDER NO. 07(M)/SPS-7-ET/QC-2008-09 |
13/02/2009 |
24/02/2009 |
24/02/2009 |
- |
No |
- |
| 184 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Const of Sarju Purwa link road Zero to Top coat under Dr Ambedkar Gramin Samagra Vikas Yojana new construction 2009 10 2009_UPPWD_97_1 |
774/TENDER/08-09 |
12/02/2009 |
19/02/2009 |
20/02/2009 |
- |
No |
- |
| 185 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Kanpur |
Widening and Strengthening of Bilhore Makanpur Visdhan Rasoolabad Road MDR 85 km 1 to 22 600 2009_UPPWD_96_1 |
787 M /39M - KV /09 |
11/02/2009 |
17/02/2009 |
18/02/2009 |
- |
No |
- |
| 186 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
W and S of Mohanlal ganj Maurawan road Ch 1 340 to 13 00 2009_UPPWD_95_1 |
1955 /523C-Lko Cir /Tender/08-09 |
10/02/2009 |
15/02/2009 |
16/02/2009 |
- |
No |
- |
| 187.2 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
providing and laying pc 20mm and type A seal coat Over Black top surface For renawal of village roads renewal 2009 10 2009_UPPWD_94_1 |
773/594C-STP/Tender/08-09 |
09/02/2009 |
19/02/2009 |
20/02/2009 |
- |
No |
- |
| 187.1 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
Providing and laying pc 20 mm and Type A seal coat over black Top road under repaire of Dr Ambedkar Gramin Samagra Vikas Yojana 2009_UPPWD_92_1 |
773/594C-STP/Tender/08-09 |
09/02/2009 |
19/02/2009 |
20/02/2009 |
- |
No |
- |
| 187 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
providing and laying pc 20mm and type a seal coat over wbm under new construction of dr ambedkar gramin samagra vikas yojana 2009_UPPWD_93_1 |
773/594C-STP/Tender/08-09 |
09/02/2009 |
19/02/2009 |
20/02/2009 |
- |
No |
- |
| 188 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
Construction of 6 Lane Road Lohia Path Gomti Bairaj to Ring Road Khurram Nagar via Kukrail Nala km 0.000 to 5.200 2009_UPPWD_90_1 |
1624 /523c-Lo /Tender |
05/02/2009 |
11/02/2009 |
12/02/2009 |
- |
No |
- |
| 189 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
Remaining Part of Widening and Strengthening Of IMK Deva Chinhat Road Km 46 to 52 under Rajaya sadak Nidhi 2009_UPPWD_91_1 |
1627 /523C-Lo /Tender |
05/02/2009 |
11/02/2009 |
12/02/2009 |
- |
No |
- |
| 190 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
Widening and Strengthening of Mohanlal ganj Maurawan road Ch 1 340 to 13 00 2009_UPPWD_89_1 |
1657 /523C Lko Cir /Tender/08-09 |
04/02/2009 |
09/02/2009 |
10/02/2009 |
- |
No |
- |
| 191 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur |
Const of Internal Road and Central Verge between Manyvar Kanshiram Smarak and Gitapalli Abadi along with Smarak Boundary Wall length 600 m 2009_UPPWD_88_1 |
1592 /523C-LKO.CIR /Tender/09 |
04/02/2009 |
05/02/2009 |
06/02/2009 |
- |
No |
- |
| 192 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow |
CONSTRUCTION OF ABHAYPUR TO AKTHI LINK ROAD [2009_UPPWD_87_1] |
661/STP-LMP/TENDER/09 |
03/02/2009 |
16/02/2009 |
17/02/2009 |
- |
No |
- |
| 193 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur/NA |
Construction of Internal Road and Central Verge in Manyvar Kanshiram Smarak |
1316 /523C-LKO.CIR /Tender/09 |
31/01/2009 |
01/02/2009 |
02/02/2009 |
- |
No |
- |
| 194 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Repair Renewal of village Roads by 20mm PC and Seal coat in Block Machhrehta Gondlamau Khairabad Misrikh in Year 2009 10 as per BOQ |
555/ 293C-STP / Tender/08-09 |
30/01/2009 |
12/02/2009 |
13/02/2009 |
- |
No |
- |
| 195 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Repair Renewal of vill Roads by 20mm PC Seal coat with Hot Mix Plant in Block Machhrehta Gondlamau Khairabad Misrikh Selected under Dr Ambedkar Gram Samgra Vikash Yojna Third Phase in Year 2009 10 As per BOQ |
556 /523c-STP/Tender/08-09 |
30/01/2009 |
12/02/2009 |
13/02/2009 |
- |
No |
- |
| 196 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur/NA |
W AND S OF Mohanlal ganj maurawan road ch 1 340 to 13 00 |
1237 /523C-LO /Tender |
29/01/2009 |
03/02/2009 |
04/02/2009 |
- |
No |
- |
| 197 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur/NA |
Construction of Painted Road of Kheri Branch Left Side Shoulder of Canal in District Sitapur |
526 /293C-STP/TENDER/0808 |
28/01/2009 |
09/02/2009 |
10/02/2009 |
- |
No |
- |
| 198 |
Chief Engineer UPPWD Kanpur Zone/S.E. UPPWD Kanpur/NA |
Widening and Strengthening of Bilhore Makanpur Visdhan Rasoolabad Road MDR 85 km 1 to 22 600 |
207 (1) M /39M - KV /09 |
27/01/2009 |
10/02/2009 |
11/02/2009 |
- |
No |
- |
| 199 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Unnao/NA |
Construction of River Training work guide spur and protection work of Road approach at Beja basat nagar Nevada piparia Annagpur at Garra River |
342cash/1M (T)/ Unnao Circle/08 |
24/01/2009 |
05/02/2009 |
06/02/2009 |
- |
No |
- |
| 200 |
UP Development Systems Corporation Ltd/UPDESCO HQ/NA |
Empanelment of Software Developers, System Integrators and Integrated System Providers |
UPDESCO/SW-EMP/2009 |
24/01/2009 |
24/02/2009 |
24/02/2009 |
- |
No |
- |
| 201 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
CONSTRUCTION OF APPROACH ROAD UPTO HOUSING SCHEME OF AVAS VIKAS PARISHAD UNDER HONRIBLE DR KASHIRAM SHAHRI |
283/294c/STP-LMP/TENDER/09 |
17/01/2009 |
29/01/2009 |
30/01/2009 |
- |
No |
- |
| 202 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Construction of Approach Road protection work for bridge located at Ghagharia River Akbapur |
157/Tender/08-09 |
15/01/2009 |
21/01/2009 |
22/01/2009 |
- |
No |
- |
| 203 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Construction of Painted Road of Kheri Branch Left Side Shoulder of Canal in District Sitapur |
109 /294C-STP/TENDER/08 |
15/01/2009 |
24/01/2009 |
27/01/2009 |
- |
No |
- |
| 204 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Widening and Rehabilitation of Sitapur City Portion of NH 24 between Lalbagh and Bus Stand |
162 /C-STPKheri /Tender/08-09 |
13/01/2009 |
22/01/2009 |
23/01/2009 |
- |
No |
- |
| 205 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur/NA |
Construction of Internal Road and Cental Verge in Manyvar Kanshiram Smarak |
393 /523c-Lo /Tender |
13/01/2009 |
14/01/2009 |
15/01/2009 |
- |
No |
- |
| 206 |
Directorate of Pinting and Stationary UP/Department of Printing and Stationary/NA |
Supply of A-1 Size Single Colour Sheet- fed Offset Printing Machine with Accessories |
IFB-07/M/08-09 |
13/01/2009 |
03/02/2009 |
03/02/2009 |
- |
No |
- |
| 206.1 |
Directorate of Pinting and Stationary UP/Department of Printing and Stationary/NA |
Supply of Automatic Disc Ruling Size 36 inch Machine with both side ruling facilities |
IFB-07/M/08-09 |
13/01/2009 |
03/02/2009 |
03/02/2009 |
- |
No |
- |
| 206.2 |
Directorate of Pinting and Stationary UP/Department of Printing and Stationary/NA |
Supply of Buckle Folding Machine |
IFB-07/M/08-09 |
13/01/2009 |
03/02/2009 |
03/02/2009 |
- |
No |
- |
| 206.3 |
Directorate of Pinting and Stationary UP/Department of Printing and Stationary/NA |
Supply of A-1 Size Dampening Washing Machine |
IFB-07/M/08-09 |
13/01/2009 |
03/02/2009 |
03/02/2009 |
- |
No |
- |
| 206.4 |
Directorate of Pinting and Stationary UP/Department of Printing and Stationary/NA |
Supply of Wire Stitching Machine Half Inch |
IFB-07/M/08-09 |
13/01/2009 |
03/02/2009 |
03/02/2009 |
- |
No |
- |
| 206.5 |
Directorate of Pinting and Stationary UP/Department of Printing and Stationary/NA |
Supply of Wire Stitching Machine 1 Inch |
IFB-07/M/08-09 |
13/01/2009 |
03/02/2009 |
03/02/2009 |
- |
No |
- |
| 206.6 |
Directorate of Pinting and Stationary UP/Department of Printing and Stationary/NA |
Supply of High Speed Power Punching Machine with die - Double Head |
IFB-07/M/08-09 |
13/01/2009 |
03/02/2009 |
03/02/2009 |
- |
No |
- |
| 207 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Construction of Aliganj main canal road from chainage 10 200 to 28 800 |
12/294C-STP-LMP/0908- |
12/01/2009 |
19/01/2009 |
20/01/2009 |
- |
No |
- |
| 208 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur/NA |
Widening and Strengthening of Lucknow Mohan road |
290 /523C-LO /Tender |
09/01/2009 |
12/01/2009 |
13/01/2009 |
- |
No |
- |
| 209 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Unnao/NA |
Construction of approach road to Manyavar Kanshi Ram Shahari Vikas Awasiya Yojna form Unnao Bypass |
60cash/1MT-Unnao circle /Tender-2008 |
06/01/2009 |
12/01/2009 |
14/01/2009 |
- |
No |
- |
| 210 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur/NA |
Widening and Strengthening of Lucknow Mohan road Ch 16.20 to 19.00 |
14656 /523C-LO /Tender |
03/01/2009 |
08/01/2009 |
09/01/2009 |
- |
No |
- |
| 211 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur/NA |
Construction of Footpath SDBC etc at Jail Road to VIP Road via Kailashpuri Geetapalli |
14676/523 c-l circle/08 |
02/01/2009 |
14/01/2009 |
15/01/2009 |
- |
No |
- |
| 212 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
CONSTRUCTION OF APPROACH ROAD UPTO HOUSING SCHEME OF AVAS VIKAS PARISHAD UNDER HONRIBLE DR KASHIRAM SHAHRI |
7085/294c/STP-LMP/TENDER/08 |
31/12/2008 |
12/01/2009 |
13/01/2009 |
- |
No |
- |
| 213 |
Directorate of Industries/Directorate of Industries/NA |
DG SET 12.5 KVA TO 25 KVA |
03(G)/SPS-7-ET/RC-2008-09 |
25/12/2008 |
23/01/2009 |
23/01/2009 |
- |
No |
- |
| 214 |
Directorate of Industries/Directorate of Industries/NA |
DG SET 3 KVA TO 10 KVA |
02(G)/SPS-7-ET/RC-2008-09 |
25/12/2008 |
23/01/2009 |
23/01/2009 |
- |
No |
- |
| 215 |
U P Irrigation Department (Mechanical)/Central Equipment and Stores Procurement/NA |
[MANUFACTURE AND SUPPLY OF ISI MARKED PVC INSULATED COPPER WINDING WIRES IN VARIOUS TUBEWELL DIVISIONS] [2008_CESPO_47_1] |
TE-628/08-09 |
22/11/2008 |
24/12/2008 |
- |
- |
No |
- |
| 216 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
[C o 6x9 m Well foundation Bridge approach road and protection] [2008_UPPWD_45_1] |
6137/294C/STP-LMP/TENDER/08 |
20/11/2008 |
20/11/2008 |
- |
- |
No |
- |
| 217 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Unnao/NA |
[Construction of Approach Road to Manyavar Kanshi RamShahari Vikas Awasiya Yojna from Unnao Bypass] [2008_UPPWD_44_1] |
5443 Cash/1 M.T. Unnao Circle/Tender/08-09 |
17/11/2008 |
15/12/2008 |
- |
- |
No |
- |
| 218 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur/NA |
Construction of Link Road from Laharpur Bhadphar Road to Bileria Jagmalpur Vijeshpur under 5054 DS |
5690/Tender/08-09 |
11/11/2008 |
24/11/2008 |
25/11/2008 |
- |
No |
- |
| 219 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Sitapur/NA |
Construction of Link Road from Laharpur Tambour Road to Pongalipur Sharada Canal Patri |
5691/Tender/08-09 |
11/11/2008 |
24/11/2008 |
25/11/2008 |
- |
No |
- |
| 220 |
UP Electronics Corporation Ltd./UPLC HQ/NA |
Empanelment Of Registered Companies in the field of IT |
UPLC/Software/Empanelment-01/2008 |
31/10/2008 |
01/12/2008 |
01/12/2008 |
- |
No |
- |
| 221 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Widening and Strengthening under CRF in District Sitapur |
5174/293C/Tender/08-09 |
17/10/2008 |
04/11/2008 |
05/11/2008 |
- |
No |
- |
| 222 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Widening and Strengthening of Sidhauli Biswan Road |
5180/ 293C/STP-KHI/Tender/08-09 |
17/10/2008 |
04/11/2008 |
05/11/2008 |
- |
No |
- |
| 223 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Construction of road from Godlamau (Natpurwa) Road at Km. 5 to Saraiya Link Road under R.I.D.F.-14 |
129/C-STPKheri /Tender/08-09 |
17/10/2008 |
23/10/2008 |
24/10/2008 |
- |
No |
- |
| 224 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Construction of Road from Ramgarh to Kailash Ashram to Charray Tali |
130/C-STPKheri /Tender/08-09 |
16/10/2008 |
23/10/2008 |
24/10/2008 |
- |
No |
- |
| 225 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Construction of 6x9 m Well foundation Bridge, approach road and protection |
5326/294C/STP-LMP/TENDER/08 |
15/10/2008 |
24/10/2008 |
25/10/2008 |
- |
No |
- |
| 226 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Construction of Milik to Gaurhi Link Road |
5327/294C/STP-LMP-TENDER/08 |
15/10/2008 |
24/10/2008 |
25/10/2008 |
- |
No |
- |
| 227 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Improvement and Construction of Footpath from Bangla Bazar Chauraha to Telibagh Chauraha |
11651/523c-Lo /Tender/08-09 |
14/10/2008 |
23/10/2008 |
24/10/2008 |
- |
No |
- |
| 228 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Improvement and Construction of Footpath from Bangla Bazar Chauraha to Telibagh Chauraha G2 |
11652/523c-Lo /Tender/08-09 |
14/10/2008 |
23/10/2008 |
24/10/2008 |
- |
No |
- |
| 229 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Improvement and Construction of Footpath from Bangla Bazar Chauraha to Telibagh Chauraha G3 |
11653/523c-Lo /Tender/08-09 |
14/10/2008 |
23/10/2008 |
24/10/2008 |
- |
No |
- |
| 230 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Improvement and Construction of Footpath from Bangla Bazar Chauraha to Telibagh Chauraha G4 |
11654/523c-Lo /Tender/08-09 |
14/10/2008 |
23/10/2008 |
24/10/2008 |
- |
No |
- |
| 231 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Improvement and Construction of Footpath from Bangla Bazar Chauraha to Telibagh Chauraha G5 |
11655/523c-Lo /Tender/08-09 |
14/10/2008 |
23/10/2008 |
24/10/2008 |
- |
No |
- |
| 232 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Improvement and Construction of Footpath from Bangla Bazar Chauraha to Telibagh Chauraha G6 |
11656/523c-Lo /Tender/08-09 |
14/10/2008 |
23/10/2008 |
24/10/2008 |
- |
No |
- |
| 233 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Widenning of existing P.W.D. and Irrigation coloney road and New Construction of missing Link from Bangla Bazar Chauraha to Telibagh Chauraha G7 |
11657/523c-Lo /Tender/08-09 |
14/10/2008 |
23/10/2008 |
24/10/2008 |
- |
No |
- |
| 234 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Unnao/NA |
Construction of Shahjahanpur road to Surji pur Shiroman nagar via yashinpur |
Cash/1-M.T. Unnao Circle /Tender/08-09 |
06/10/2008 |
20/11/2008 |
21/11/2008 |
- |
No |
- |
| 234.1 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Unnao/NA |
Construction of Shahjahanpur road to Surji pur Shiroman nagar via yashinpur |
Cash/1-M.T. Unnao Circle /Tender/08-09 |
06/10/2008 |
03/11/2008 |
05/11/2008 |
- |
No |
- |
| 235 |
UP Development Systems Corporation Ltd/UPDESCO HQ/NA |
Updesco Hardware Empanelment 2008 |
UPDESCO/HW-EMP/2008 |
09/09/2008 |
15/10/2008 |
15/10/2008 |
- |
No |
- |
| 236 |
Directorate of Pinting and Stationary UP/Department of Printing and Stationary/NA |
Supply of Printing Machines |
03_M_08-09 |
05/09/2008 |
16/10/2008 |
16/10/2008 |
- |
No |
- |
| 236.1 |
--Do-- |
Supply of Printing Machines |
03_M_08-09 |
05/09/2008 |
16/10/2008 |
16/10/2008 |
- |
No |
- |
| 236.2 |
--Do-- |
Supply of Printing Machines |
03_M_08-09 |
05/09/2008 |
16/10/2008 |
16/10/2008 |
- |
No |
- |
| 236.3 |
--Do-- |
Supply of Printing Machines |
03_M_08-09 |
05/09/2008 |
16/10/2008 |
16/10/2008 |
- |
No |
- |
| 237 |
Directorate of Pinting and Stationary UP/Department of Printing and Stationary/NA |
Supply of Testing Machine and Equipments |
02_M_08-09 |
05/09/2008 |
16/10/2008 |
16/10/2008 |
- |
No |
- |
| 237.1 |
--Do-- |
Supply of Testing Machine and Equipments |
02_M_08-09 |
05/09/2008 |
16/10/2008 |
16/10/2008 |
- |
No |
- |
| 237.2 |
--Do-- |
Supply of Testing Machine and Equipments |
02_M_08-09 |
05/09/2008 |
16/10/2008 |
16/10/2008 |
- |
No |
- |
| 237.3 |
--Do-- |
Supply of Testing Machine and Equipments |
02_M_08-09 |
05/09/2008 |
16/10/2008 |
16/10/2008 |
- |
No |
- |
| 237.4 |
--Do-- |
Supply of Testing Machine and Equipments |
02_M_08-09 |
05/09/2008 |
16/10/2008 |
16/10/2008 |
- |
No |
- |
| 238 |
Department of Printing and Stationary |
Supply of Ruling Ink PowderRed |
IFB_12_RM_08-09 |
29/08/2008 |
23/09/2008 |
23/09/2008 |
- |
Yes |
- |
| 238.1 |
--Do-- |
Supply of Ruling Ink Powder Blue |
IFB_12_RM_08-09 |
29/08/2008 |
23/09/2008 |
23/09/2008 |
- |
Yes |
- |
| 238.2 |
--Do-- |
Supply of Royal Offset Ink |
IFB_12_RM_08-09 |
29/08/2008 |
23/09/2008 |
23/09/2008 |
- |
Yes |
- |
| 238.3 |
--Do-- |
Supply of Vivid Green Offset Ink |
IFB_12_RM_08-09 |
29/08/2008 |
23/09/2008 |
23/09/2008 |
- |
Yes |
- |
| 238.4 |
--Do-- |
Supply of Dence Black Offset Ink |
IFB_12_RM_08-09 |
29/08/2008 |
23/09/2008 |
23/09/2008 |
- |
Yes |
- |
| 238.5 |
--Do-- |
Supply of Gloria red Ink |
IFB_12_RM_08-09 |
29/08/2008 |
23/09/2008 |
23/09/2008 |
- |
Yes |
- |
| 238.6 |
--Do-- |
Supply of High Speed Web Offset Black Ink |
IFB_12_RM_08-09 |
29/08/2008 |
23/09/2008 |
23/09/2008 |
- |
Yes |
- |
| 239 |
UP Development Systems Corporation Ltd/UPDESCO HQ/NA |
Hardware Procurement for Board of Revenue, UP |
UPDESCO/BOR-01/HW/2008 |
26/08/2008 |
25/09/2008 |
25/09/2008 |
- |
Yes |
- |
| 240 |
Department of Printing and Stationary |
Supply of Printing Inks |
IFB-11/RM/08-09 |
12/08/2008 |
22/08/2008 |
22/08/2008 |
- |
Yes |
- |
| 240.1 |
--Do-- |
Supply of Printing Inks |
IFB-11/RM/08-09 |
12/08/2008 |
22/08/2008 |
22/08/2008 |
- |
Yes |
- |
| 240.2 |
--Do-- |
Supply of Printing Inks |
IFB-11/RM/08-09 |
12/08/2008 |
22/08/2008 |
22/08/2008 |
- |
Yes |
- |
| 240.3 |
--Do-- |
Supply of Printing Inks |
IFB-11/RM/08-09 |
12/08/2008 |
22/08/2008 |
22/08/2008 |
- |
Yes |
- |
| 240.4 |
--Do-- |
Supply of Printing Inks |
IFB-11/RM/08-09 |
12/08/2008 |
22/08/2008 |
22/08/2008 |
- |
Yes |
- |
| 240.5 |
--Do-- |
Supply of Printing Inks |
IFB-11/RM/08-09 |
12/08/2008 |
22/08/2008 |
22/08/2008 |
- |
Yes |
- |
| 240.6 |
--Do-- |
Supply of Printing Inks |
IFB-11/RM/08-09 |
12/08/2008 |
22/08/2008 |
22/08/2008 |
- |
Yes |
- |
| 241 |
UPPWD Central Zone/S.E. UPPWD Sitapur |
Construction of Road at Kiwani River,Patna Jahangeerabad |
3764/293C/Tender/08-09 |
12/08/2008 |
24/08/2008 |
25/08/2008 |
- |
Yes |
- |
| 242 |
UPPWD Central Zone/S.E. UPPWD Sitapur |
Approach Road at Kiwani River near Madnapur |
3770/293 C-STPKheri/Tender/08-09 |
12/08/2008 |
24/08/2008 |
25/08/2008 |
- |
Yes |
- |
| 243 |
Department of Printing and Stationary |
Supply of Country Jute Twin Sutli |
IFB No. 08/R.M./08-09 |
15/07/2008 |
21/08/2008 |
21/08/2008 |
- |
Yes |
- |
| 244 |
Department of Printing and Stationary |
Supply of Indain Hessian Cloth |
08/R.M./08-09 |
15/07/2008 |
21/08/2008 |
21/08/2008 |
- |
Yes |
- |
| 245 |
UPPWD Central Zone/S.E. UPPWD Lucknow |
Widening And Strengthening of Salon Unchahar Road |
01/e-tender/7476/lko-cir/08-09 |
14/07/2008 |
10/09/2008 |
11/09/2008 |
- |
In Process |
- |
| 246 |
Department of Printing and Stationary |
Supply of 25 Kg. Art Paper Size 59.4x84.1 cms. 100 GSM |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.1 |
--Do-- |
Supply of 18.5 Kg. Azure laid Paper size 59.4x84.1 cms. 75 GSM |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.2 |
--Do-- |
Supply of Duplicating Paper Full Scape size (Shree Bhawani Make) |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.3 |
--Do-- |
Supply of Type Paper Full Scape size 55 GSM Mohit/Century/Orient Brand |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.4 |
--Do-- |
Supply of Photo Copier Paper (J.K./Century Brand in Red Packing) B-4 Size 75 GSM |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.5 |
--Do-- |
Supply of Photo Copier Paper (J.K./Century Brand in Red Packing) A-3 size 75 GSM |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.6 |
--Do-- |
Supply of Photo Copier Paper (J.K./Century Brand in Red Packing) Full Scape size 75 GSM |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.7 |
--Do-- |
Supply of Photo Copier Paper (J.K./Century Brand in Red Packing) A-4 size 75 GSM |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.8 |
--Do-- |
Supply of 35.5Kg. Pulp Board Light Blue size56x71 cms 180 GSM |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.9 |
--Do-- |
Supply Of 35.5Kg. Pulp Board Yellow size 56x71 cms180 GSM |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.10 |
--Do-- |
Supply of 35.5Kg. Pulp Board Pink size 56x71 cms180 GSM |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.11 |
--Do-- |
Supply of 35.5Kg. Pulp Board Green size 56x71 cms180 GSM |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.12 |
--Do-- |
Supply of 15.1Kg. Pulp Board White size 56x71 cms. 300 GSM |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.13 |
--Do-- |
Supply of 9.3 Kg. Executive Bond Paper size 45.5x58.5 cms. 70 GSM |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.14 |
--Do-- |
Supply of 13.3 Kg. Executive Bond Paper size 45.5x58.5 cms. 100 GSM |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.15 |
--Do-- |
Supply of 21.3 Kg. S.S. Maplitho Paper size 58.5x91 cms. 80 GSM with Brightness 80 Percent Minimum |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.16 |
--Do-- |
Supply of 23.8Kg. Cover Paper Blue size 56x71 cms |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.17 |
--Do-- |
Supply of 23.8Kg. Cover Paper Yellow size 56x71 cms |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.18 |
--Do-- |
Supply of 23.8Kg. Cover Paper Pink size 56x71 cms |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 246.19 |
--Do-- |
Supply Of 23.8Kg. Cover Paper Green size 56x71 cms |
04/P/08-09 |
20/06/2008 |
25/07/2008 |
25/07/2008 |
- |
Yes |
- |
| 247 |
Chief Engineer UPPWD Central Zone/S.E. UPPWD Lucknow/NA |
Widening & Strengthening of Salon Unchahar Road(MDR-7)Under Central road fund |
01/e-tender/7476/lucknow-cir/08-09 |
01/06/2008 |
24/06/2008 |
25/06/2008 |
- |
C |
- |
| 248 |
Department of Printing and Stationary |
Supply Of White Offset Printing Paper -60 G.S.M. (Flat/Reel) |
03/P/08-09 |
01/06/2008 |
03/06/2008 |
03/06/2008 |
- |
Yes |
- |
| 248.1 |
--Do-- |
Supply Of Cream Wove Paper – 60 G.S.M. (Flat/Reel) |
03/P/08-09 |
01/06/2008 |
03/06/2008 |
03/06/2008 |
- |
Yes |
- |
| 249 |
Chief Engineer UPPWD Central |
Widening & Strengthening of Road |
2454/Tender/08-09 |
01/06/2008 |
27/06/2008 |
28/06/2008 |
- |
Yes |
- |